Skip to main content

Creating a Route

This guide walks you through creating a new route in FlowForth.

Before You Begin

You need the Organization Admin role to create routes. You should also have activities scheduled for the date you want to plan.

Step-by-Step

  1. Navigate to the Route Planner page from the main navigation menu.
  2. Use the date navigation controls to select the date you want to create a route for.
  3. Click the Create Route button.
  4. Enter the following details:

Route Information

  • Name (required) — A short name for the route (e.g., "North District", "Morning Run").
  • Date — The date is set automatically based on the currently selected date in the planner.

Create route dialog

Create route dialog

  1. Click Create to save the new route.

The route is created in Draft status with no activities or team members assigned. You can now:

Creating Routes from the Activity Planner

You can also create a route directly from the Activity Planner:

  1. Select the activities you want to include in the route.
  2. Click Create Route in the bulk action toolbar.
  3. Choose the route settings and assign team members.
  4. Confirm the operation.

This creates the route and assigns the selected activities in one step.

Automatic Route Creation

If you have route templates configured, FlowForth can automatically create routes based on activity tags. This saves time when you have a predictable daily routing pattern.

What's Next?

After creating a route, you'll typically want to:

Was this page helpful?